When does a deck or stair need a guard, how high must it be, and why aluminium railings are popular in Vancouver? A plain-language guide to the BC Building Code basics, with a diagram.
Kitchens and bathrooms are where most renovation problems hide: plumbing, wiring, ventilation and waterproofing. Here's the right order of work, the permits you'll need and the decisions to make before demolition starts.
Both add a rental or family home to your lot. A basement suite usually costs less; a laneway house gives more privacy and often higher rent. Here's a side-by-side comparison for Greater Vancouver owners.
A permitted renovation is inspected at set stages, mostly before walls are closed. Here's what inspectors look at during framing, rough-in, insulation and final inspections, and how to avoid failed inspections.
Drywall is when a new house starts to feel like a home. Here's what happens at this stage on our Vancouver builds: boarding, taping, window returns, dropped ceilings and feature walls, and what a homeowner should look for.
Once drywall goes up, plumbing, wiring and ducts are hidden for good. Here's what we check at the rough-in stage on our Vancouver builds: laundry, bathroom fans, dryer exhaust, venting and the floor topping over radiant heat.
When a heated room sits over an open outdoor space, the underside of that floor is part of the building envelope. Here's how our crew insulated and closed in the overhangs at our South Vancouver builds, and why we chose DensGlass.
A look inside three homes we're building in South Vancouver: a main house and laneway at 909 E 64th Ave and a laneway home at 7920 Windsor St. Exterior sheathing, rough-ins, floor topping and drywall, photographed on site this month.
Painting and new flooring usually don't need a permit. Moving walls, changing plumbing, new wiring, additions and suites do. Here's a simple chart, what happens if you skip a permit, and Vancouver's new fast-track for simple renovations.
Thinking of building your own home in BC? Here's how BC Housing's Owner Builder Authorization works: who qualifies, the exam, the one-year rule, the 10-year liability and what it means when you sell.








