Some homeowners in BC choose to build their own house instead of hiring a licensed residential builder. The province allows this, but only with an Owner Builder Authorization from BC Housing’s Licensing & Consumer Services branch. The authorization comes with real responsibilities that last long after you move in.
This guide explains how the owner-builder route works in BC, what it asks of you, and the questions to think through before you decide. It applies across the province, including Vancouver and Burnaby.
What an owner-builder is
Under BC’s Homeowner Protection Act, new homes are normally built by a licensed residential builder and covered by third-party 2-5-10 home warranty insurance. The owner-builder authorization is an exemption: it lets an individual build a home for their own use without a builder’s licence and without mandatory warranty insurance.
In return, the law puts the builder’s responsibilities on you. BC Housing’s bulletin for owner-builders says you are “ultimately responsible for the overall construction of the home for a period of 10 years.”
Who qualifies
According to BC Housing, to qualify you generally must:
- Be an individual, not a company.
- Have a registered interest in the land, such as ownership on title (or a long-term registered lease).
- Be building one dwelling unit: a single detached home, or one unit in or attached to a building more than 10 years old, or attached to a new non-residential building.
- Intend to build, or directly manage the construction of, all or substantially all of the home yourself.
- Intend to live in it yourself for at least one year after it’s finished.
- Meet the waiting period if you’ve built before: 18 months after first occupancy of your first owner-built home, three years after a second, and five years after that.
BC Housing’s FAQ says authorizations are not issued for units in new multi-unit residential buildings. If you’re planning a new duplex or multiplex, the owner-builder route generally won’t apply. For a laneway home or other unusual case, ask BC Housing directly before you plan around it.
The exam, the fee and the order of steps
Every applicant has to pass the Owner Builder Authorization exam. BC Housing describes it as 100 multiple-choice questions in 100 minutes, with a pass mark of 70%. It covers construction basics and your legal obligations, and you can take it online with a remote proctor or at a proctoring centre. You get one attempt per application, and BC Housing publishes a free exam guide.
| Step | What happens |
|---|---|
| 1. Apply to BC Housing | Apply online and pay the fee. BC Housing lists the fee as $425, of which $50 is non-refundable if the application doesn’t go ahead (approximate; confirm the current fee). |
| 2. Pass the exam | 100 questions, 70% to pass, one attempt per application. |
| 3. Get your authorization | You receive the authorization and a New Home Registration Form sealed by BC Housing. |
| 4. Apply for the building permit | Take the registration form to the City (for example Vancouver or Burnaby) with your permit application. The City won’t issue a permit for a new home without it. |
| 5. Build and pass inspections | You organise the trades, the schedule and every City inspection yourself. |
| 6. Report occupancy | When the home is occupied, tell BC Housing the occupancy date and the trades you used. |
You must manage the build yourself
This is the rule that surprises people most. As an owner-builder, you are the general contractor. You can hire trades for specific work, such as framing, plumbing or electrical, but BC Housing says hiring a builder, construction manager, project manager or anyone else to do the general contractor’s job is an offence for both you and the person you hire, with penalties of up to $25,000, prosecution or both.
In practice, that means you coordinate the excavator, foundation, framer, roofer, mechanical and electrical trades, order materials, keep the site safe, book inspections and fix whatever an inspector flags. Each City requires a long series of inspections for a new home; see our guide to building inspections for a new home.
It’s also a big time commitment. For reference, on a straightforward lot a professional builder typically takes about 10 months from foundation to finish (approximate, not counting design, permits or landscaping). Managing the same work around a full-time job can take longer.
The one-year rule and selling later
- No sale during construction: you can’t offer an owner-built home for sale while it’s being built.
- Live in it for one year: after the occupancy permit, you must live in the home yourself for at least a year. You can’t sell it, offer it for sale or rent it during that time. BC Housing can allow an early sale for undue hardship, through a Permission to Sell application with a $100 processing fee.
- Disclosure for 10 years: if you or any later owner sells within 10 years of occupancy, buyers must receive an Owner Builder Disclosure Notice before signing. It tells them the home was owner-built, when the 10-year period started and whether voluntary warranty insurance is in place.
Buyers and their realtors can check any home on BC Housing’s New Homes Registry, which shows whether it has warranty insurance or was built under an owner-builder exemption.
The 10-year liability
If you sell within 10 years, you remain personally liable to later buyers for defects, along the same lines as the 2-5-10 warranty a licensed builder must provide:
| Period after occupancy | What you’re liable for |
|---|---|
| 2 years | Defects in materials and labour |
| 5 years | Building envelope defects, including water leaks |
| 10 years | Structural defects |
The big difference is who pays. With a licensed builder, a warranty insurer stands behind the home. With an owner-built home, there is no insurer: the buyer deals with you directly, and BC Housing notes that litigation may be the only remedy. You can’t sign this liability away in the sales contract. Owner-builders can buy voluntary home warranty insurance, which changes how the disclosure notice reads; ask a warranty provider what’s available.
Lenders and buyers may also look at owner-built homes more carefully. It’s worth asking your lender early how they treat an owner-built project and its construction draws.
Questions to ask yourself first
- Do I have the time to manage trades, deliveries and inspections, often on weekdays?
- Do I understand the BC Building Code, the building envelope and the City’s inspection stages well enough to supervise trades?
- Can my budget absorb mistakes, delays and rework without a builder carrying that risk?
- Do I plan to stay at least a year, and am I comfortable being liable for defects for 10 years if I sell?
- Is my project one home, or a duplex or multiplex that the owner-builder route doesn’t cover?
If the answers point the other way, hiring a licensed residential builder means the builder carries the licence, the warranty and the day-to-day management. Our guides to comparing builder quotes and construction management vs. general contracting explain the main ways to set that up.
Related reading
- BC’s 2-5-10 home warranty explained
- Construction management vs. general contracting
- How to compare builder quotes in BC
- The building permit process, step by step
- Building inspections for a new home
Weighing up building it yourself versus hiring a licensed builder?
Sources
- BC Housing: Information for Owner Builders (Regulatory Bulletin No. 4, PDF)
- BC Housing: Owner Builder FAQs (PDF)
- BC Housing: Owner Builder Authorization Exam
- BC Housing: Buying or Selling an Owner-Built Home
- BC Financial Services Authority: Can you legally sell an owner-built home?
Fees and figures are approximate and change over time. Confirm the current owner-builder requirements with BC Housing and the permit requirements with your municipality before you start.