Zoning, Title, Trees, Slope, Streams, Old Oil Tanks and the Other Things to Check Before You Buy a Lot to Build On

Buying land to build a new home is different from buying a house to live in. The questions that matter are not about the kitchen or the paint. They are about what the City will let you build, what is registered on the title, what is under the ground and how hard the site will be to build on.

Most of these things can be checked before your offer goes firm. This guide walks through the main ones for lots in Vancouver and Burnaby, in the order we suggest checking them.

In short: before you remove subjects, confirm the zoning and how many homes the lot allows, read the full title and its registered charges, and look for the “hidden” issues: protected trees, slope and soil, nearby streams, heritage status, an old buried oil tank and the condition of the services in the street. Each one can change what you can build, what it costs and how long it takes.

1. Zoning: what can you build here?

Zoning decides how many homes the lot can hold, how big they can be and where they can sit. After BC’s small-scale multi-unit housing changes, many former single-family lots now allow several homes, but the exact number depends on lot size, frontage and location.

  • Vancouver (R1-1 zone): the R1-1 district schedule sets minimum site sizes for multiplexes. A multiplex of 3 or 4 homes needs at least 306 m² of site area and 10.0 m of frontage; 5 homes need 464 m² and 13.4 m; 6 or more need 557 m² and 15.1 m. Other conditions apply, so read the full schedule for your lot.
  • Burnaby (R1 zone): under provincial rules the City must allow up to four homes per lot, and up to six near frequent transit. Burnaby limits lot coverage to about 40 to 50% and requires a 4 m front yard. Our guide How many homes can I build on my Burnaby lot? goes through the details.

Don’t rely on the listing or on what the neighbours built. Check the zone on the City’s map, then read the district schedule or ask the City’s development enquiry service.

2. The title: what is registered against the land?

Order a title search from the Land Title and Survey Authority of BC (LTSA), along with copies of the registered charges and the plan. BC’s real estate regulator calls the title search “often the first step in the due diligence process”, and recommends confirming the land on the plan rather than relying on the street address.

Charges that can affect a new build include:

  • Restrictive covenants: can limit height, use, building location or the number of homes. These always need to be read in full.
  • Statutory rights of way: often for City pipes or utilities. Some cover only part of the lot, shown on a plan, and you usually can’t build over them.
  • Easements: rights of access or drainage across your land, or across a neighbour’s land for your benefit.
  • Statutory covenants held by the City: for example, conditions set when the lot was subdivided or previously developed.

A real estate lawyer or notary can explain which charges will stay on title and what they mean for your plans.

3. The site itself: slope, soil and trees

The ground decides how much the foundation and site work will cost. A relatively flat lot with no significant trees is the simplest to build on. On a straightforward lot like that, building a custom home takes about 10 months from foundation to finish (approximate), not counting design, permits and landscaping. A steep or wet site, or one with protected trees, adds work.

What to look forWhy it mattersWho checks it
Slope and retaining wallsMore excavation, shoring and engineered wallsLand surveyor, geotechnical engineer
Soil and groundwaterCan change the foundation design and drainageGeotechnical engineer
Large trees, on your lot or near the property lineProtected trees can limit where the house goesCertified arborist
Lane accessAffects parking, construction access and laneway home optionsDesigner, City planning
Old house on the lotDemolition, hazardous materials survey and recycling rulesHazardous materials consultant, builder

See our guides to land surveys, geotechnical reports and tree bylaws and arborist reports for more on each.

4. Streams, ravines and heritage

  • Streams and ravines in Burnaby: Burnaby’s Streamside Protection and Enhancement Development Permit Area covers lots within 30 m of the top of a stream bank, and lots near ravine banks. On those lots, a development permit is generally needed before building, adding on, clearing or grading, unless an exemption applies. You can check a lot on the City’s streamside map.
  • Heritage in Vancouver: properties on the Vancouver Heritage Register must go through a heritage review when you apply for permits. Check the heritage status early, before you commit to a design.

5. What’s buried: oil tanks and past uses

Many older homes in Vancouver and Burnaby were once heated with oil. The City of Vancouver says heating oil tanks that haven’t been used for two years must be removed, and any contaminated soil replaced with clean soil. Removal is the owner’s responsibility, and a contractor can scan the lot for a tank. Ask the seller for any tank removal records, or make a scan a condition of your offer.

If a lot was ever used for certain commercial or industrial activities, BC’s contaminated sites rules can require a Site Disclosure Statement when you apply to the City for a permit that involves disturbing soil. This is uncommon for typical residential lots, but worth asking about if the property’s history is unclear.

6. Costs beyond the purchase price

Land is only the first cost. Budget for these too:

  • Property transfer tax: 1% on the first $200,000, 2% up to $2 million and 3% above that, plus a further 2% on residential value over $3 million. On a $2 million lot, that works out to about $38,000.
  • Demolition of any existing house.
  • City charges and service connections: see development cost charges and water, sewer and storm connections.
  • Construction: about $250 to $350 per square foot is a typical mid-range figure for a new home in Vancouver and Burnaby (approximate). There is no upper limit: premium finishes and materials can take it as high as you choose. See the cost to build a house in Vancouver.

A simple checklist before you remove subjects

  1. Confirm the zone and how many homes the lot allows.
  2. Read the title, every registered charge and the plan.
  3. Look at slope, trees, lane access and any nearby stream or ravine.
  4. Check heritage status (Vancouver) and streamside status (Burnaby).
  5. Ask about oil tanks and the property’s past uses.
  6. Get a rough budget for the whole project, not just the land.

Many buyers ask a builder or designer to walk the lot before the offer goes firm. A short site visit often answers the big questions early, while you can still walk away.

Related reading

Please note: This page is general information, not legal, financial or professional advice. The facts, figures, bylaws, fees and code requirements described here were accurate to the best of our knowledge when it was published or last updated. These rules change often and differ from city to city, so some details may have changed since. Before you make decisions, please confirm the current requirements with your city’s planning and building department and with qualified professionals. We’re always happy to help you check what applies to your property.

Looking at a lot and want to know what you could build on it?

Talk to Xerox Builders

Mandeep Singh, Builder and Director at Xerox Builders
Written by
Mandeep Singh
Builder & Director, Xerox Builders Ltd. · BC Housing Licensed Residential Builder

Mandeep has been a licensed residential builder in BC for almost 10 years. He builds custom homes, laneway homes, duplexes and multiplexes in Vancouver, Burnaby, Surrey and Delta, and writes these guides so homeowners know what to expect before they build.